Assessment 2 – Part 1B
For all answers, indicate the clause, figure or table number where you found you answer.
1 According to the BCA, what are the normal site condition soil classifications?
Ref…………….
2 What is the slope ratio for a site cut on an unprotected embankment for silt
soil type?
Ref …………..
3 How far from an allotment boundary must a house on an adjoining property
be if you wish to excavate at the allotment boundary without requiring
additional protection work?
Ref ……………..
4 If you wish to excavate a footing for your property adjacent to a footing on
an adjoining property, what does the BCA require you to do?
Ref …………….
5 What is the maximum height that the BCA will allow you to create an
unprotected embankment?
Ref ……………
6 If my building is located in a low rainfall intensity area, what is the minimum
requirement for concrete paving surrounding the concrete slab with regard
to slope away from the building?
Ref ……………
7 How high must my concrete slab be above a garden bed if it is not located in
a low rainfall intensity area?
Ref ……………
8 Nominate three examples of discharge points that might be acceptable to an
appropriate authority
Ref ……………
9 How much cover is required for a stormwater drain if it runs under a
reinforced concrete driveway?
Ref ……………
10 What is a primary building element in relation to termite risk management?
Ref ……………
11 What is the relevant Australian Standard to be consulted for Termite Risk
Management?
Ref ……………
12 Nominate two types of physical barriers that could be used for termite risk
management?
Ref ……………
13 If I require a termite risk system for a timber sub floor to a brick veneer
construction, what is the requirement for subfloor access?
Ref ……………