CPCCBC4008B Assessment Task-1

  • Posted
  • Authoradmin
  • Length1,968 words
  • Reading time9 min
Write My Assignment FREE

Masudur Rahman 1
CPCCBC4008B
Assessment Task-1
Timely payments and variation request (Maximum of 500 words)
You are required to take corrective action and complete requisite form as per Metharom’s policy.
A) Michael has requested for a variation which will cause a slight variation in cost and delay of a week in the
estimated schedule (refer to appendix A for additional information). You will need to complete the variation
document provided and submit to the assessor.
Guidance:
TO: (OWNER/S) ___________________________________________________________________
FROM: ______________________Metharom Construction_________________________________
SITE ADDRESS: ____________________________________________________________________
This variation is required for:
Required by law
Excavation and foundations
Owner/Owner’s Representative
Contractor/Contractor’s Representative
The change to the Works is: _________________________________________________________
________________________________________________________________________________
The change is required because: _____________________________________________________
________________________________________________________________________________
The Contractor’s reasonable estimate of the period of delay in the Date for Practical Completion that
will result from the variation is: ___________________ business days.
The variation will change the price payable by the Owner as follows:
Increase the price by $___ _____
No change to price
Decrease the price by $________
Increase/decrease the price by an amount that will be calculated as follows:
For a standard 8′ wide door, typically with an aluminium or vinyl frame – $1020

Material Cost $510 each
+ Labour Cost (install all scenarios) $38 per hour

2 people working for 6 hours
____0000+000+(00x0x0)=0000_________
Masudur Rahman 2
CPCCBC4008B
The increase or decrease in the Total Price payable by the Owner as a result of the variation will
be taken into account by the Contractor as evidenced by the Contractor’s progress claim for the
stage:
_____________________________________________________________________________
_____________________________________________________________________________
Owner’s/Owner’s Representative’s Initials: ________________________________
SIGNED: (OWNER) ________________________________________________
DATE: __________________________________________________________
SIGNED: (CONTRACTOR) ___________________________________________
DATE: __________________________________________________________
B) The site supervisor claims for clean-up costs as back charge to the subcontractor. As per the contract, the
subcontractors are required to leave the place of work in neat, clean condition. Complete the relevant form and
justify the back charge using Metharom policy. Refer to Appendix B.
Guidance:
Student is required to complete the subcontractor back charge notice form and submit.
Subcontractor Details information from appendix.
Finishing your uncompleted work
Description of the work
Description: removed debris at the work site as the subcontractor’s personnel didn’t finish the cleaning).
Labour: 2 hours of labor ($28 per hour)
Materials: 5 black plastic garbage bags $1.8 each
Other expenses: Mobilisation, payroll tax, insurance, overhead supervision- $32.17
Dumpster fees $45
A back charge will be deducted from your account. The breakdown of this back charge is listed below:
Labour: 0x00=00
Materials: 0x0.0=0
Other expenses: mobilisation, payroll tax, insurance, overhead supervision- $32.17
Dumpster fees $45
Total: $000.00
Justification:
Note: Please read student guide/handbook performance criteria 1.3,1.4 & 1.7 for this assessment task.
Masudur Rahman 3
CPCCBC4008B

correcting your defective work
finishing your uncompleted work
repairing damage you made to the work of the others
Metharom Construction – Subcontractor back charge notice
you must complete the above described work by
A back charge will be deducted from your account. The breakdown of this back charge is as listed below
Company name
submitted form
By———
Total——
Date —–
Description of the work

other expenses
We will incurr the following expenses
We have incurred additional expense due to the following
labor—–
materials
subcontractors city Subcontractors zip code
Subcontractor phone
Date of notice
Project address Project city project description
Subcontractor name Subcontractor address
Masudur Rahman 4
CPCCBC4008B
Assessment Task-2
Prepare an analytical report. (Maximum of 800 words)
Analyse the situations below, and prepare a report explaining how you would prevent them from occurring again in the
future. You will need to provide a solution for each scenario.
A) A significant problem has been identified with the cabinetry, which was completed by a subcontractor carpenter.
This has resulted in a requirement for re-work. The re-work has delayed the schedule by at least two weeks, and has
an additional cost because of the labour and materials required. Ensure corrective actions are taken and
communicated with written documentation. Write a memo to the carpenter addressing the unsatisfactory work.
Sample answer: The student may include solutions as follows:
• Poor standard of workmanship can be the reason
• Back charge notice to subcontractor for rework
• Payments to be made deducting the back charge
• Written documentation with description of rework, material used and additional cost
• Supervision and inspection on-site on regular intervals
• State strategies for reducing the incidence of rework are identified and discussed
Note: Please paraphrase from the above options and add more solutions.
Write a memo to the carpenter addressing the unsatisfactory work.
B) The supplier of tiles for this project is waiting on an outstanding payment. This is affecting Metharom’s reputation
and relationship with the supplier, which will result in losing out on the discount given to Metharom for regular
payments.
Sample answer: Student may cover similar points in their report:
• Track /monitor payments to suppliers
• Dispute management
• Supplier management
• Material management
• Payment records
• Entry of the transactions in site diary
• Monitoring cash flow
Note: Please paraphrase from the above options and add more solutions.
C) Site safety has not been monitored effectively resulting in two minor accidents so far (refer to appendix C).
Sample answer: The report included
Mandatory Safety Meetings –
Safety Gear –
Reflective Clothing –
Regular Breaks –
Insurance claims addressed
Electrical Safety Training
Fall Protection Safety Training
Safety training on high-speed and sharp motorized equipment is imperative.
required insurances for site losses or damages
Note: Please paraphrase from the above options and add more solutions.
Note: Please read student guide/handbook performance criteria 1.5, 1.6, & 2.6 for this assessment task.
Masudur Rahman 5
CPCCBC4008B
Assessment Task 3
Maintain a site diary. (Maximum of 800 words)
There is an inspection scheduled to be conducted next week by the construction manager. You are required to share
the complete site diary that is maintained at the site.
A) Each work site is allowed $500 to spend on emergencies and unexpected costs. In the last week 2 employees
have withdrawn money from this allowance.
Bob needed to buy a new drill due to the old one breaking unexpectedly (at a cost of $93.50)
The plumber had 8 boxes of washers that has been taken from his truck while onsite (worth $38.96)
This information needs to be recorded into the site diary, Also complete the withdrawal form as a process followed at
site (refer to appendix D).
Guidance: Students are required to enter all the pending transactions in the site diary and submit it to you. Students
are playing the role of a site supervisor for this unit.
Date_____________ Amount in dollars ______________________
Name _________________ Cost centre_____________
Project/site address Description of cost ________________________________________

___________________________
___________________________
Authorised signature
Withdrawn by ______________
Cash Withdrawal form for site work

Date_____________ Amount in dollars ______________________
Name _________________ Cost centre_____________
Project/site address Description of cost ________________________________________

___________________________
___________________________
Authorised signature
Withdrawn by ______________
Cash Withdrawal form for site work

Masudur Rahman 6
CPCCBC4008B
B) Below are the pending entries that need to be recorded in the site diary (additional information in appendix E).
• Dispute on disrespectful behaviour & bullying by one of the employees at site
• Meeting conducted on workplace safety to induct all employees on new equipment handling
• Unsatisfactory work notice (as completed in assessment 2b)
• A schedule of the inspections that are required on a domestic building site
• Site instruction/ file note – the client requesting to change the colour of the front door from black to
white now. The cost is the same but still needs to be documented and clarified. (complete the site
instruction form ) Appendix E
• Incidents and accidents at work site (assessment 2d)
Appendix E: Site instruction form
Once the diary is complete, it is to be submitted to the construction manager (your assessor will play the role of the
construction manager).
Note: Please read student guide/handbook performance criteria 2.1,2.2, 2.3,2.4,2.5 & 2.7 for this assessment
task.

Client name Project:……………………………….. Job no.
Issued by :
Signature
Received by :
Signature
Site instruction form
Notes

r Day Labour r Site instruction r Transmittal r Request for information r Memo
Issued to: ________________
Attention: ____________________
Date: ______________

Masudur Rahman 7
CPCCBC4008B
Assessment Task- 4
Prepare procedures to ensure quality outputs. (Maximum of 500 words)
Write a quality control procedure that details how you will:
a) Inspect the site to ensure that the work being performed meets legislative, regulative, and contractual quality
requirements (You need to explain in details).
b) Organise inspections carried out by the building surveyor (You need to explain in details).
c) Communicate quality requirements and expectations to the work team (You need to explain in details).
You will need to create one checklist that monitors the build for quality at the end of the base stage. These
documents must be compiled into one procedural document and submitted to your assessor.
Guidance: Students also need to create a checklist that monitors the build for quality at the end of the base stage.
Checklist for base stage inspection can include
Sample answer: Student included the following in the checklist
£ Site conditions
£ Site improvements/conditions
§ Landscaping
§ Driveways/access/slope
§ Crossover
§ Paving
§ Fencing
§ Builder’s sign/site identification
§ Stormwater pipes
£ Floor Structure
£ Sewage pipes
£ Plumbing
£ Electrical
£ Phone/data cable
£ Termite control
£ Quality assurance
£ Check on Hazardous Material
£ Check on Pipeline Condition
£ Check on Ventilation condition
£ Check on Indoor Air Condition
£ Check on Electrical and Telecommunications system Condition
£ Check on Environmental impact
£ Others please specify
Note: Please read student guide/handbook performance criteria 3.1,3.2,3.3,3.4,3.5,3.6 & 3.7 for this assessment
task.
Masudur Rahman 8
CPCCBC4008B
Assessment Task- 5
Meet with the client to determine any defect liabilities. (Max 250 words)
Meet with the client (to be played by your assessor). Together, you will inspect and discuss any problems with the
house that the client wants fixed before handover. If defects are found they will need to be recorded into the defect
liability checklist, and you will need to discuss how the defects will be fixed. You and the client will both need to sign
the checklist to indicate your agreement.
Guidance: Students will play the role of the site supervisor, they are required to take notes of the identified defects
and suggest how they will rectify the defects and the timelines required.
Below are some defects. You may choose any random two.
o Pressure clean mortar and cement off the retaining walls externally
o Generally detail the doors and frames and patch small dents and chips; also coverage is poor on
most of the doors.
o Drops of paint on the kitchen table
o There is a slight leakage in the bathroom wash basin
Please address Role-Play script between the site supervisor and client.
Site supervisor: Greetings/Good morning
Client: You too
Note: Students are required to handover the completed defects liability checklist and a document with the defect
rectification(Appendix F)
Note: Please read student guide/handbook performance criteria 4.5, 4.6 & 4.7 for this assessment task.

Date checked Item work needed Maintenance works description Completed completed date checked by owners signature
Defect liability checklist
Site Supervisor: Owners:
Signature Signature

Masudur Rahman 9
CPCCBC4008B
Assessment Task- 6
Prepare a business letter regarding handover for the client. (Maximum of 300 words)
Prepare a business letter for the client that explains what will happen during the handover process. This letter is to
keep the client informed, and ensure that they are aware of what is the status of the project.
You will need to include information regarding:
a) The inspection process
Guidance: When you arrange for a Handover Inspection – this is a list of what should be inspected
Site Conditions
Site Improvements/Conditions
Outbuildings
External
Brickwork
Balcony
Patio
Porch
Verandah
Deck
Carport
Frame
Roof Framing
Roof Covering
Floor
Joinery
Each Internal Room
Specifically for Kitchen/Meals
Specifically for each Bedroom
Specifically for each Bathroom
Specifically for each Toilet
Specifically for Laundry
Specifically for Garage/Carport/Storeroom
Note: Please chose the above random options and add more inspection process .
b) Certificates and warranties that are provided to the client, including termite protection and appliance warranties (list
minimum 4)
Guidance: (You need to choose any 4 options from the checklist and explain them in details).
c) Handover procedures (list minimum 5 things that can be included in the procedure).
Guidance: (You need to choose any 5 options from the checklist and explain them in details).
Note: Please read student guide/handbook performance criteria 4.1, 4.2, 4.3 & 4.4 for this assessment task.
Reference: Please put your references at the end and add ASSESSMENT 7– WRITTEN ASSESSMENT answer.

The post CPCCBC4008B Assessment Task-1 appeared first on My Assignment Online.

Plagiarism Free Assignment Help

Expert Help With This Assignment — On Your Terms

✓ Native UK, USA & Australia writers ✓ Deadline from 3 hours ✓ 100% Plagiarism-Free — Turnitin included ✓ Unlimited free revisions ✓ Free to submit — compare quotes

admin

Academic writer and editor at BestWriters.

Get your paper off your plate tonight

Post your instructions for free. Prices start at $5 per page.

Place an order