Limited Offer Get 25% off — use code BESTW25
No AI No Plagiarism On-Time Delivery Free Revisions
Claim Now
Prices start at $5 per page · plagiarism-free papers · free revisions for 14 days 24/7 support: support@bestwriters.com
Uncategorized

Define a work breakdown structure and describe

  • Posted
  • Authoradmin
  • Length322 words
  • Reading time2 min
Write My Assignment FREE

CIS 517 Week 5 Assignment 3: VoIP Part 1

This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.

Overview As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.

Deliverable 1: Summary (MS Word or open source equivalent)

1. Write a one to two (1-2) page summary document in which you:

a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).

b. Define a work breakdown structure and describe the methodology behind constructing one.

Deliverable 2: WBS (MS Project or open source equivalent)

2. Use Microsoft Project to create a WBS which:

a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.

b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.

c. Contains Work Breakdown Structure Code for each task.

d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.

Deliverable one (1) of your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The post Define a work breakdown structure and describe appeared first on My Assignment Online.

Plagiarism Free Assignment Help

Expert Help With This Assignment — On Your Terms

✓ Native UK, USA & Australia writers ✓ Deadline from 3 hours ✓ 100% Plagiarism-Free — Turnitin included ✓ Unlimited free revisions ✓ Free to submit — compare quotes

admin

Academic writer and editor at BestWriters.

Get your paper off your plate tonight

Post your instructions for free. Prices start at $5 per page.

Place an order