1 | P a g e
University of Bradford- Faculty of Management, Law and Social Sciences COVID-19
FoMLSS/ DEPARTMENT
Derivative Pricing & Valuation AFE 7507
Alternative Assessment:
Submission Date: May 11th 2020, 11.59 pm
Assignment
INSTRUCTIONS TO CANDIDATES
This assignment is an alternative assessed piece of work as a substitute for the
examination. It is to be completed individually.
It accounts for 50% of the total marks available for this module.
Total word count for this assignment is 1500.
All students need to be aware that the current rules and regulations on
plagiarism prescribed by the University apply and you are advised to become
fully familiarised with their content before starting your preparation.
The submission date is Friday May 11th 2020.
The course work is to be prepared in a single WORD file and submitted
through CANVAS.
2 | P a g e
University of Bradford- Faculty of Management, Law and Social Sciences COVID-19
Instructions on Presentation
The submission has to adopt the following formatting conventions:
• Maximum word count of the work should be about 1500 words, excluding tables, figure and
appendices.
• The work should be written in easy-to-read English using an academic style, and without
journalistic hyperbole.
• Pagination: each page is to be numbered consecutively from 1, except the first.
• The first page is the title page containing the title “Alternative Assessment”, Module name
and code, and the word count.
• The body of contents should be sectionalized and numerically ordered.
• Minimum font size is Times Roman 12 pt. or equivalent, with double or 1.5 line spacing.
• Text is to be justified both left and right.
• Tables and figures must have a title and be numerically ordered. If convenient, they are to be
placed near the relevant text, or if large, exhibited in an appendix following the conclusion.
• All external sources of information must be cited using the University standard citation style.
Complete details of all citations are to be collected under the “List of References”.
• Equations such as formulas should be entered using an equation editor and numbered.
Complex derivations should be assigned to an appendix.
3 | P a g e
University of Bradford- Faculty of Management, Law and Social Sciences COVID-19
Assignment
Students are required to answer BOTH of the following two questions:
1. Explain the key characteristics of the real option approach to valuing a project
opportunity and critically discuss the strengths and weaknesses of adopting this
approach.
(Mark: 50%)
2. Based on the following case study “Mafutec”, critically evaluate the adopted real
option approach to valuing the oil project opportunity in Ruvuma by discussing the
suitability of the approach, the analysis, and its strengths and weaknesses. Interpret
its results including any simulations you may wish to make, and provide a justified
recommendation to the Mafutec management on the maximum bid for the oil lease.
(Mark: 50%)
4 | P a g e
University of Bradford- Faculty of Management, Law and Social Sciences COVID-19
Case Study “Mafutec”
An oil extraction company, Mafutec, is facing the decision concerning a future major
opportunity. An auction for a 20-year lease on a property in the Ruvuma basin is nearing,
and management require to know the maximum bid that can be offered.
The lease would offer the winner of the auction the following: (i) the lease-holder has a
maximum of 10 years to actually develop the necessary oil well infrastructure to extract the
oil, and (ii) once the infrastructure is developed (if ever at all) the lease-holder may extract
25 million barrels of crude oil per year for a maximum of 10 years. If the infrastructure
development was not completed within 10 years from holding the lease, then the lease
would be terminated at that time.
The economic, technological, geological and mineral properties for the oil reserve are well
understood and widely publicized. The development infrastructure is expected to cost
$1250.0 million, as new pipelines, well-head facilities as well as roads and social facilities
would be necessary. There would be no permitted reclamation costs at the end of the project.
Straight line depreciation is applied so the annual depreciation charge is $125.0 million.
The extraction cost is $40.0 per barrel. The government has set a dedicated corporate tax
rate on profit for this project at 40.0%.
At the time of the auction, the spot price for crude oil is $45.80 per barrel. The convenience
yield for oil is 3.5% (annual continuous rate) and its annual volatility is 15.0%. The riskfree rate is 6.0% (annual continuous rate).
An oil consultancy firm is employed to prepare the financial evaluation, see appendix. The
consultants first extrapolate the forward price curve based on forward pricing principles.
The net cash flow for each of the 10 years of extraction are computed using the information
provided above, the present value of this net cash flow stream is obtained by discounting
at the risk-free rate since forward prices contain no risk premium1, and finally the net
1 If the expected future prices for oil had been applied, the risk-adjusted discount rate reflecting the market
risk in the revenues and the degree of operating leverage would have produced the same result, provided
markets are complete and integrated.
5 | P a g e
University of Bradford- Faculty of Management, Law and Social Sciences COVID-19
present value (NPV) is computed. The NPV analysis of operating the lease, given the
current economic conditions and assumptions about the reserve, informs the prospective
bidder of the fair price for a bid. The evaluated NPV is $433 million, and this is most likely
the most Mafutec should bid for the opportunity.
In their analysis, the consultancy firm show that for any year t, the after-tax revenue is:
= – V S0 e 1 (r y t – ) ( ),
and after-tax cost is:
c V (1 ) K
T
= – + ,
so, the present value ($ million) of the revenue cash flow stream for an extraction maturity
of 10 years is:
0 (1 5695 70 ) e 1 e ( )
1 e
y yT
y
V S .
– –
–
–
= – =
–
,
and the present value ($ million) of the cost cash flow stream for an extraction maturity of
10 years is:
(1 4013 06 ) e 1 e ( )
1 e
r rT
r
K
c V .
T
– –
–
–
= – + =
–
| , |
where V = 25 million barrels denotes the annual extraction volume, S . 0 = 45 8 ($) the
current spot price per barrel, c = 40 ($) the per barrel extraction cost, K =1250 ($ million)
the capital investment expenditure, T =10 (years) the extraction maturity period, the
= 0 40 . the appropriate corporate tax rate, and y . = 0 035 the oil convenience yield, and
r . = 0 060 the risk-free rate. The present value (PV) of the net cash flow stream is:
5695.70-4013.06=1682.65.
Then NPV PV K . . . = – = – = 1682 65 1250 0 432 65.
6 | P a g e
University of Bradford- Faculty of Management, Law and Social Sciences COVID-19
The consultants have also attached an analysis based on a real option methodology – see
the attached Excel sheet.
– THE END OF THE PAPER –
The post Derivative Pricing & Valuation AFE 7507 appeared first on My Assignment Online.