UTS: Engineering & Information Technology (2014) Assignment Cover Sheet
| UTS: ENGINEERING & INFORMATION TECHNOLOGY | ||
| SUBJECT NUMBER | NAME OF STUDENT(s) (PRINT CLEARLY) SURNAME FIRST NAME |
STUDENT ID(s). |
| SUBJECT NAME | ||
| STUDENT EMAIL | STUDENT CONTACT NUMBER | |
| NAME OF TUTOR | TUTORIAL GROUP | DUE DATE |
| ASSESSMENT ITEM NUMBER/ TITLE | ||
| I confirm that I have read, understood and followed the guidelines for assignment submission and presentation on page 2 of this cover sheet. I confirm that I have read, understood and followed the advice in my Subject Outline about assessment requirements. I understand that if this assignment is submitted after the due date it may incur a penalty for lateness unless I have previously had an extension of time approved and have attached the written confirmation of this extension. Declaration of Originality: The work contained in this assignment, other than that specifically attributed to another source, is that of the author(s) and has not been previously submitted for assessment. I understand that, should this declaration be found to be false, disciplinary action could be taken and penalties imposed in accordance with University policy and rules. In the statement below, I have indicated the extent to which I have collaborated with others, whom I have named. Statement of Collaboration: Signature of Student(s) ____________________________________________________________Date_________________________ |
||
| - — – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – | ||
| ASSIGNMENT RECEIPT | To be completed by the student if a receipt is required | |
| SUBJECT NAME/NUMBER | NAME OF TUTOR | |
| SIGNATURE OF TUTOR | RECEIVED DATE |
ASSIGNMENT COVERSHEET
| Patel Urvesh Dineshbhai | 12762353 | 49119 |
| Problematic Soils and Ground Improvement Techniques |
||
| UrveshDineshbhai.Patel@student.uts.edu.au | +61 470671040 | |
| Dr Behzad Fatahi | 11/06/2017 | Knight Riders |
| x x x Urvesh Patel 11/06/2017 |
UTS: Engineering & Information Technology (2014) Assignment Cover Sheet
STYLE GUIDE for ASSIGNMENT SUBMISSION
Before submitting an assignment you should refer to the policies and guidelines set out in the:
| |
Faculty Student Guide (https://my.feit.uts.edu.au/modules/myfeit/downloads/StudentGuide2010Spring_Online.pdf) UTS Library writing guidelines (www.lib.uts.edu.au/students/discover-your-library/referencing-and-writing) ELSSA Centre for writing support (www.elssa.uts.edu.au) UTS Coursework Assessment Policy (www.gsu.uts.edu.au/policies/assessment-coursework.html) |
Unless your Subject Co-ordinator has indicated
otherwise in your Subject Outline for each subject,
you must follow the instructions below for submission
of assignments in UTS: Engineering and UTS: IT.
Writing Style
It is usually best to write your initial draft in the default
settings of your software without formatting. Use the
following guides in your writing.
Purpose and Audience: use the correct genre and
language style expected for the particular task.
Language: use “Plain English” for all technical
writing. More information about this language style
can be found at www.plainenglish.co.uk/freeguides.html.
Use spelling and grammar software tools to check
your writing. Edit your document.
Standards: always use:
| | Australian spelling standards (Macquarie Dictionary) SI (International System of Units) units of measurement ISO (International Organisation for Standardisation) for writing dates and times for |
| | |
| |
international documents. For example yyyymm-dd or hh-mm-ss. However, for most
applications it is more helpful to present the date
in full as 26 August 2010.
Graphics and Tables should:
| |
be numbered have an appropriate heading and/or caption be fully labeled be correctly referenced. |
Presentation
Unless otherwise instructed, all assignment
submissions should be wordprocessed using spellcheck and grammar-check software. Work should be
well edited before submission. Use the following
default settings.
Page Setup: set margins at no less than 20mm all
round.
Paper: print on A4 bond, double -spaced and
preferably double-sided, left justified.
Font: use the software default style to provide
consistency. The recommended style includes:
| |
10 – 12 pt font consistent formatting with a limited number of fonts lines no more than 60 characters (use wider margins or columns if you need to make lines shorter) |
| |
Header: should include
| |
your name and student number the title of the paper or task. |
Footer: should include the page number and current
date.
Cover sheet and statement of originality: all work
submitted for assessment must be the original work
of the student(s) submitting the work. A standard
faculty cover sheet (see over) must be attached to
the front of the submission. Any collaboration
between the submitting student and others must be
declared on the cover sheet.
Referencing
All sources of information used in the preparation of
your submission must be acknowledged using the
Harvard system of referencing. This includes all print,
video, electronic sources.
Phrases, sentences or paragraphs taken verbatim
from a source must be in quotation marks and the
source(s) cited using both in-text referencing and a
reference list.
Plagiarism is the failure to acknowledge sources of
information. Students should be fully aware of the
meaning of plagiarism and its consequences both to
your marks, position at the university and criminal
liability. The plagiarism in your assignment
submissions can be assessed both in hard copy and
in soft copy through submission to such sites as
Turnitin.
The UTS Library and the ELSSA Centre (web links
listed above) both have information for students on
referencing correctly to support you in avoiding
plagiarism.
Group Work Contribution and Assessment (to be filled by individual students)
Major Research Project
Problematic Soils and Ground Improvement Techniques (49119)
(Attach this page as the 2nd page of the report after cover page)
(No more than 1 page)
Group and Individual Details
| Student Name and # (submitting student) |
Urvesh Dineshbhai Patel , 12762353 |
| Group Name | Knight Riders |
| Group Members | 1. Ashutosh Patel 2. Tanveer Ahmad 3.Bowen Wu 4.Urvesh Patel 5. Anwar Kazi 6. Wakeel Alam |
| General Topic of Group | Effects of Vertical drains |
| Individual Topic/paper Title |
Comparison of drainage line elements in PLAXIS 2D |
| Paper ID | Z-4 |
Group and Learning Experience
| What did you learn from other group members about your project? (Please be specific explaining what did you learn from who) |
• Anwar Kazi- Some part of simulation, I learnt about calculating the phases • Ashutosh Patel- Making the Graph in PLAXIS 2D. • Tanveer Ahmed – Entering the soil parameters in PLAXIS 2D • Wakeel Alam- Helped me collection of soil parameters. • Bowen Wu- comparison between different soil types |
| How did you contribute to the learning of other members of the group about the project? Please provide specific examples. |
• Helped with initial soil models and creating different soil layers. |
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 1
Contents
Executive Summary………………………………………………………………………………………………………………2
1.0 Introduction……………………………………………………………………………………………………………………..2
2.0 Literature Review…………………………………………………………………………………………………………….3
3.0 Aim of the Project ……………………………………………………………………………………………………………3
4.0 PLAXIS 2D Modelling Dimensions and Geometry…………………………………………………………..4
5.0 Material Properties and Assumptions Used in the Plaxis 2D Model………………………………..5
6.0 Explanation about Calculation Steps ………………………………………………………………………………7
7.0 Obtained Results …………………………………………………………………………………………………………….9
8.0 Discussion of results ……………………………………………………………………………………………………..11
9.0 References ……………………………………………………………………………………………………………………12
List of Figures
Figure 1 Project Properties
Figure 2 Soil Layers
Figure 3 Input of Material Properties for Clay 1
Figure 4 Mesh Generated of model
Figure 5 Completed Calculation Phases
Figure 6 Stress Point Selection
Figure 7 Deformed Mash
Figure 8 Measured settlement below test field
List of Tables
Table 1 Parameters of Soil Layers
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 2
ANALYSIS OF SETTLEMENTS OF TEST
EMBANKMENT DURING 50 YEARS
Executive Summary
This report is dealing with time dependent settlements calculated with numerical
methods using Plaxis 2D, a two-dimensional numerical program based on the finite
element method. Plaxis is very practical for solving complex geotechnical problems
involving settlements or slope stability. The data used for modelling is referred from
the research conducted by “BAHATIN GÜNDÜZ”, document titled “Analysis Of
Settlements Of Test Embankments During 50 Years – A Comparison Between Field
Measurements and Numerical Analysis”. The purpose this research is to establish a
relation between stresses and strains in the material and compare it with the field data.
Due to lack of the data in the research paper all necessary data are assumed
appropriately. Test embankments are constructed on test field and results are
presented in this report. The aim of this report is to calculate settlement of test
embankment during 50 years by using PLAXIS 2D.
1.0 Introduction
Nowadays use of numerical calculation programs and specially based on finite
element method are being used for major projects in leading countries. Plaxis is one
of those programs. Plaxis is a numerical program based on the finite element method
and is very useful for calculation of loads, deformations and water flow in soil and for
geotechnical constructions. Plaxis is mainly a two-dimensional and three-dimension
program for statically computing.
Swedish geotechnical institute was founded in 1944 and it started a research of a new
international airport outside Stockholm. Lilla Mellösa was selected as a primary site
for that. But soil under Lilla Mellösa had compressible soil layers till great depth. In
geotechnical engineering, embankments can be used as pre-loads for the
underlying soil. The applied load consolidates the foundation soils such that the
final as-built superstructure can be constructed. So, test embankment was
constructed on field to study the process of consolidation and to consolidate the soil
for future. Land was not selected for the airport but test fields were left behind for
further investigation.
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 3
I have taken the soil parameters of that site for the modelling and to study calculations.
All necessary data are assumed to get the best results. There are eight level of
different compressible soil and a test embankment is constructed above it. And results
are shown for different period of time for comparison and for study settlement of soil
layers periodically.
2.0 Literature Review
The test embankment was constructed for Newington-Dover project using
prefabricated vertical drains to help accelerate the settlement of underlying clay.
Consolidation of clay is primarily dependent on the dissipation of pore water pressure
generated from the applied load. As pressure dissipation occurs, the water is released
from the void space in the soil leading to settlement and tighter and stronger soil
structure. Total settlement or consolidation may take months or years to occur as it
depends on the permeability of the underlying soils. Installing drains provides artificial
drainage and shorten the time of consolidation.(Santamaria 2015).
Consolidation is a term utilised to express the process of transferring the total stress
to effective stress and enhancing the pore water pressure by soaking out the water
from soil (Gunduz 2008). This occurs when a load is put into the action or by enhancing
the applied load on the saturated soil layers. In the initial stages the enhanced forces
(total stresses) are taken by the water present in the pores thus resulting in an
increased pore water pressure. If the drainage is permitted the resultant hydraulic
gradient begins to take water out from the clay and thus resulting into the compressed
soil structure (Gunduz 2008). Also, the applied load reduces the surplus pore
pressure. When the excess pore pressure load becomes zero the soil skeleton carries
the applied load.
3.0 Aim of the Project
Aim of this report is to find settlements calculated by plaxis at proposed test fields.
This report is based on research conducted by BAHATIN GÜNDÜZ. Field of Lilla
Mellösa was selected as test field.
Aim is to find settlement results and pore pressure stress of test embankment for the
50 years of time period and study the results.
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 4
4.0 PLAXIS 2D Modelling Dimensions and Geometry
To perform the analyses of embankment on given test field of Lilla Mellösa,
dimensions of the test embankment are assumed properly. The geometry is
symmetrical so the analysis was performed for the half the width of the embankment.
For analyses the height was taken as 3.0 m. the width of the embankment was taken
as 51.0 metres. The gradient of the slopes is 1:2.
Figure 3 Project Properties
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 5
The embankment was resting on the eight different soil layers. Name of the soil layers
are gravel, dry crust, organic clay 1, organic clay 2, clay 1, clay 2, varved clay and
sand respectively. Depth of this soil layers are 5m, 1m, 2m, 7m, 7m 12m, 15m and 7m
respectively.
Figure 4 Soil Layers
5.0 Material Properties and Assumptions Used in the Plaxis 2D
Model
As mentioned earlier there were eight layers in total beneath the embankment. The
soil parameters for all the layers of the soil are taken from the research paper by
(Gündüz 2008). Model is selected as plain strain condition and 15- node element.
The ground water table was under 10 m beneath ground. A detailed table was given
below including all major soil properties parameters.
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 6
| Layer | Gravel | Dry crust |
Org clay 1 |
Org clay 2 |
Clay 1 | Clay 2 | Varved clay |
Sand | Embankment |
| Mtrl model |
HS | HS | SSC | SSC | SSC | SSC | SSC | HS | HS |
| Type | Drained | Drained | Drained | Drained | Drained | Drained | Drained | Drained | Drained |
| γUnsat | 18 | 15 | 13 | 14 | 16 | 18 | 19 | 18 | 16 |
| γsat | 21 | 17 | 15 | 16 | 18 | 20 | 22 | 21 | 19 |
| Kx | 0.01 | 1.18E-04 | 8.60E-04 | 1.70E-04 | 2.60E-04 | 3.45E-04 | 4.55E-04 | 5.00E-01 | 3.499 |
| Ky | 0.01 | 1.18E-04 | 8.60E-04 | 1.70E-04 | 2.60E-04 | 3.45E-04 | 4.55E-04 | 5.00E-01 | 3.499 |
| Cref | 0.025 | 4 | 4 | 4 | 4 | 4 | 4 | 0.025 | 1 |
| phi | 37 | 30 | 30 | 30 | 30 | 30 | 30 | 40 | 30 |
| Psi | 7 | 0 | 0 | 0 | 0 | 0 | 0 | 10 | 0 |
| Λ* | – | – | 0.250 | 0.220 | 0.210 | 0.190 | 0.180 | – | – |
| K* | – | – | 0.050 | 0.044 | 0.042 | 0.038 | 0.036 | – | – |
| µ* | – | – | 1.70E-02 | 1.50E-02 | 1.40E-02 | 1.30E-02 | 1.20E-02 | – | – |
| Vur | – | – | 0.15 | 0.15 | 0.15 | 0.15 | 0.15 | – | – |
| K0nc | – | – | 0.569 | 0.635 | 0.635 | 0.635 | 0.0635 | – | – |
| Eref | – | – | – | – | – | – | – | – | – |
| V | – | – | – | – | – | – | – | – | – |
| E50ref | 40000 | 5000 | – | – | – | – | – | 25000 | 25000 |
| E0ref | 35000 | 4555 | – | – | – | – | – | 20000 | 25000 |
| M | 0.5 | 0.5 | – | – | – | – | – | – | 0.5 |
| Strength | Rigid | Rigid | Rigid | Rigid | Rigid | Rigid | Rigid | Rigid | Rigid |
Table 2 Parameters of Soil Layers
Figure 3 Input of Material Properties for Clay 1
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 7
Figure 4 Mesh Generated of model
6.0 Explanation about Calculation Steps
The construction of embankment is divided in to two faces. After the construction of
the first part of the embankment it is consolidated for the 30 days. After that second
part is constructed and it was left for consolidated for 250 days, 500 days and 50 years
respectively. That make five phases are calculated excluded initial phase.
In the first phase a consolidation analysis is performed and the loading type selected
was staged construction. The time interval of 1.0 day was used and for the rest of the
parameters were set to default. The second and third phases are also a consolidation
analysis with the loading type as a staged construction and the time interval selected
were 30 days and 250 day respectively. Again the default values were used for the
other remaining parameters. The only difference was in the third phase second part of
embankment was activated. In the fourth phase of the consolidation analysis the
loading type was selected. For the fourth and fifth phase values are selected same as
phase two just time intervals are selected 500 days and 18250 days (50 years).
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 8
Figure 5 Completed Calculation Phases
After the successful completion of all the phases the curve points were selected for
the calculation of settlement and pore water pressures. Four differnet points were
selected for example point A was selected at the toe of the embankment point B was
selected in the middle of the embankment, point C was selected at the heel of the
embankment and the last fourth point was taken randomly at the middle of the soil
below the embankment.
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 9
Figure 6 Stress Point Selection
7.0 Obtained Results
As a result of the calculation deformed mesh is as shown below.
Figure 7 Deformed Mash
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 10
The result from the test embankment from Lilla Mellösa can be seen in figure 6 as
below. Time in days is shown on the X axis and settlement (Uy) in meters on Y axis.
The line diagram shown in the figure represents settlement of embankment on certain
duration of time. Results are shown for four different stress points as mentioned above.
From the diagram settlement of test embankment for a specific period of time can be
estimated. It is obvious and clearly obtained that settlement is liner over the time.
Figure 8 Measured settlement below test field
Line diagram in figure represent excess pore pressure in test embankment along with
the change in the time. Time in days is shown in x axis and the pore pressure in KN/m3
is shown on Y axis. It can be derived from the diagram that with a sudden decrease in
excess pore pressure for initial years and it increases slightly over the long period of
time.
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 11
Figure 9 Measured excess pore pressure of test field
8.0 Discussion of results
Because all the simulations involved had time dependent behaviour, the soft soil layers
had the selection of Creep model in all the calculation. Field curve shown in figure 6
has less sharp slope than the actual curve of field data from Lilla Mellösa. Curves are
showing a large settlement in the beginning until the first 200 days. This is because
the test fill has vertical drains installed and of that reason a large settlement in the
beginning is expected. Water content is much less in bottom layers and also there are
no vertical drains installed in the bottom part which makes the consolidation process
go slower than at the beginning. The curves are also indicating that no ending of
settlement is in approach. The excess pore pressure obtained from Plaxis starts to
decrease much earlier than the field data.
In conclusion, created model achieve good results in settlements but not in
excess pore pressures.
Urvesh Patel 12762353
PROBLEMATIC SOILS AND GROUND IMPROVEMENT TECHNIQUES 12
9.0 References
Gündüz, B. 2008, ‘Analysis of settlements of test embankments during 50 years-a
comparison between field measurements and numerical analysis’.
Santamaria, A.J. 2015, ‘Finite element analysis of PV drains for a test embankment
on soft clay’, University of New Hampshire.
Yildiz, A. 2009, ‘Numerical modelling of vertical drains with advanced constitutive
models’, Computers and Geotechnics, vol. 36, no 6, pp.1072-1083.