You are to prepare a Specification for the construction an industrial driveway pavement made
from interlocking concrete pavers that sits upon an existing base course. This segmental
concrete pavement is an upgrade to a former existing asphalt driveway surface which was 100
mm in thickness.
Site description and obtained original construction detail
This driveway has a length of 50 metres and a width of 8 metres that will allow trucks to pass
and the driveway slopes downhill with a 5% grade. It has minimal crossfall.
The site has a stormwater surface collection system installed. At the halfway distance and at
bottom of the driveway there is a rain water collection drain to collect runoff. In the removal
of the asphalt these formed concrete drains and their surface grates remain undamaged and
are to be reused. Each drain being 8 metres long (driveway width) and 500 mm in overall
width (including grate), drains to the same side and rainwater empties into a 300 mm diameter
segmental concrete drainage pipe which in turn empties into a stormwater pit at the bottom of
the driveway. The 300 mm drainage line is not beneath the driveway. On the opposite side of
the driveway, and along the driveway length the segmental pavement edge is contained by the
wall of the adjacent building on the next property.
From the property boundary to the road the local council has specified that the driveway
entrance across this public land will be constructed in reinforced concrete as essentially a flat
slab with a 1% cross-fall towards the road. This slab is constructed with adequate reinforcing
steel at the top and bottom of the slab to resist structural overload by its intended vehicular
traffic. The slab is 170 mm in thickness. [You do not have to specify the construction of the
concrete entrance slab but you need to know what the segmental pavement is connecting to at
the property boundary.]