| Assessment Task | Weighting | Due | Length | ULO |
| Assessment 1: Quiz 30 minutes test comprising of multiple choice questions |
10% | Week 4 | 30 mins | ULO-1 |
| Assessment 2: Report Schedule Students are required to describe and discuss different phases of the project life cycle, develop a WBS and a company network diagram of the case project. |
20% | Week 5 | 2000 words |
ULO-1 ULO-2 ULO-3 ULO-7 |
| Assessment 3: Applied Project Discuss how the project quality management plan can provide adequate standards and controls in managing global teams in projects. Your discussion must provide adequate arguments for the need of cultural awareness and legal issues. |
30% | Week 10 | 2500 words |
ULO-2 ULO-3 ULO-4 ULO-5 ULO-6 ULO-7 |
| Assessment 4: Tutorial Participation and Submission Weekly exercises assess students’ ability to understand theoretical materials. |
10% | Weeks 1-10 | N/A | ULO-1 ULO-2 ULO-3 ULO-4 ULO-5 ULO-6 ULO-7 |
| Assessment 5: Case Study Discuss reasons for failure and propose a solution how project management techniques can solve problems for a particular Case Study. |
30% | Week 12 | 2500 words |
ULO-1 ULO-2 ULO-3 ULO-4 ULO-5 ULO-6 ULO-7 |
Assessment Brief
Page | 2
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Assessment 1: Quiz
| Due date: | Week 4 |
| Group/individual: | Individual |
| Word count / Time provided: | 30 minutes |
| Weighting: | 10% |
| Unit Learning Outcomes: | ULO-1 |
Assessment Details:
This quiz will assess your knowledge of key content areas (Week 1, 2 and 3 contents) and to identify
further support needs. For successful completion of the quiz, you are required to study the material
provided (lecture slides, tutorials, and reading materials), engage in the unit’s activities, and in the
discussion forums. The prescribed textbook is the main reference along with the recommended
reading material. By completing this assessment successfully, you will be able to identify key aspects
of scope management as per best project management practices. This will then help in achieving
ULO1, this in turn will help you in achieving CLO-1, which collectively with other unit learning
outcomes will help in achieving GA2.
Marking Information: The quiz will be marked out of 100 and will be weighted 10% of the total
unit mark.
Assessment 2: Report Schedule
| Due date: | Week 5 |
| Group/individual: | Individual |
| Word count / Time provided: | 2000 words |
| Weighting: | 20% |
| Unit Learning Outcomes: | ULO-1, ULO-2, ULO-3, ULO-7 |
| Course Learning Outcomes: | CLO-1, CLO-2 |
| Graduate Attributes: | GA1, GA5 |
Assessment Details:
Introduction.
Cardiovascular diseases (CVDs) are the number one of death globally: more people die annually from
CVDs than from any other cause.
Most CVDs can be prevented by addressing behavioural risk factors such as tobacco use, unhealthy
diet and obesity, physical inactivity and harmful use of alcohol using population-wide strategies.
People with CVD or who are at high cardiovascular risk (due to the presence of one or more risk
factors such as hypertension, diabetes, hyperlipidaemia or already established disease) need early
detection and management using counselling and medicines, as appropriate.
Page | 3
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Professor John Price is a heart surgeon. He published a number of research paper in the area of
CVDs.
Dr Ben Williams as a physicist and a mathematician whose research interests are bio-medical
statistics and mathematical models.
John and Ben worked together on a Machine Learning project related to processing of ECG test data
for detecting heart diseases. They performed hundreds of electrocardiogram (ECG) tests on patients
with CVDs. Analysing ECG tests they came up with a conclusion that some heart diseases with a high
probability can be diagnosed using Machine Learning algorithms.
ECG graph
ECG devices
Page | 4
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Business Model.
The researchers discussed the results with doctors, information technology professionals and
government officials, and decided to start a new business venture, called CardioHealth, to provide
ECG test services. They proposed a following business model:
• A general practitioner directs a patient to a medical laboratory to do an ECG test
• The ECG test is done by qualified medical personnel in a country or a city area.
• The test data are sent to a Cloud-based application.
• The results are stored in a Cloud database.
• The Cloud-based application processes the ECG test data using the Machine Learning
algorithms and produces the result.
• If the result shows that the patient might have a heart problem, then this result is sent to an
assigned Cardiologist for analysis. The Cardio doctor uploads his/her conclusion back to the
Cloud, and it is stored in the database. The report is also sent to the general practitioner.
The following diagram represents a high-level application infrastructure.
After series of meetings, John and Ben secured a funding for the project involving an investor, Arthur
Davis, and applying for a government biomedical start-up grant. Mr Arthur Davis has become a
business partner. The partners came to a conclusion that the project duration is one year from 1
January 2020 to 31 December 2020.
Assume that you’ve been appointed as a CardioHealth’s IT Project Manager for the consulting
company: Information System Services (ISS).
The ISS company is organised around projects and has the following divisions:
Page | 5
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
• Michael Flynn is an ISS Chief Information Officer
• The Application Group is involved in the development of business applications. Padma Tilak
is a Head of the Group.
• The Artificial Intelligence and Machine Learning Group implements Data Mining, Machine
Learning and Artificial Intelligence algorithms into business applications. Bruce Henry is a
Head of the Group.
• The Database Group specialises in data modelling, programming, data entry and
implementation of database projects. Helen Mills is a Head of the Group.
• The Cloud Computing Group provides migrations of IT project on the Cloud. John Fuller is a
Head of the Group.
Project Requirements.
The CardioHealth have the following information system requirements at this time:
• Develop an application of reading digital signals from an ECG device, and processing,
displaying and sending the data to the Cloud
• Set up 20 ECG data collection centres which involves
o buying ECG devices and laptops
o installing software
o connecting to Internet
o staff training
• Setup software as a service (SaaS) on the Cloud
o Develop and install a web server
o Design and setup the database to store ECG test data
o Upload ECG data
o Develop and install the Data Mining and Machine Learning application
o Download stored data on request of a general practitioner and a cardiologist
o Notify a general practitioner and download a cardiologist’s report
• Develop a cardiologist mobile application with the following functionality:
o Inform the doctor about the ECG test that requires analysis
o Download and display the ECG data
o Record the doctor’s report
o Upload the doctor’s report
o Download on request history data
In your Report you need to produce the following documents:
• Description of the life cycle phases for this project
• Kick-off meeting document
• Stakeholder Register
• Project Charter
• Detailed (multi-level) Work Breakdown Structure diagram
Page | 6
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Please remember that this is a practical assessment and you are NOT required to write any general
information, definitions and references to books and articles. These items will not be marked.
Marking Criteria and Rubric: The assessment will be marked out of 100 and will be weighted 20%
of the total unit mark
| Marking Criteria | Not satisfactory (0-49%) of the criterion mark) |
Satisfactory (50-64%) of the criterion mark |
Good (65-74%) of the criterion mark |
Very Good (75-84%) of the criterion mark |
Excellent (85-100%) of the criterion mark |
| Demonstrate an understanding of PM theory and phases of the project (20%) |
Inadequate own words understanding of PM concepts and phases of IS projects |
Basic knowledge only of understanding of PM concepts and phases of IS projects |
Exhibits breadth and depth of understanding of PM concepts and phases of IS projects |
Exhibits accurate and detailed breadth and depth of understanding of PM concepts and phases of IS projects |
Displays exceptional understanding of PM concepts and phases of IS projects |
| Produce a Project Charter document explaining the public benefits of the proposed business venture, how to communicate those benefits to the business and discuss the key quality threats related to the project (30%) |
Inadequate understanding of project communication management for IS projects; cannot discuss concepts in own words |
Basic knowledge only of project communication management for IS projects; limited depth of basic concepts |
Exhibits breadth and depth of understanding of project communication management for IS projects |
Exhibits accurate and detailed breadth and depth of understanding of project communication management for IS projects |
Displays exceptional understanding of concepts and their practical application of project communication management for IS projects |
| Demonstrate understanding of communication management and ability to create the project documents (30%) |
Inadequate understanding of appropriate techniques and tools for project communication management; cannot discuss concepts in own words |
Basic knowledge only of appropriate techniques and tools for project communication management; limited depth of basic concepts |
Exhibits breadth and depth of understanding of appropriate techniques and tools for project communication management |
Exhibits accurate and detailed breadth and depth of understanding of appropriate techniques and tools for project communication management |
Displays exceptional understanding of concepts and their practical application of appropriate techniques and tools for project communication management |
| Demonstrate understanding of Project Management tools, techniques and ability to create appropriate diagrams that will help to visualise information necessary for the project (20%) |
Inadequate understanding of controlling potential risks on specific IS projects; cannot discuss concepts in own words |
Basic knowledge only of controlling potential risks on specific IS projects; limited depth of basic concepts |
Exhibits breadth and depth of understanding of controlling potential risks on specific IS projects |
Exhibits accurate and detailed breadth and depth of understanding of controlling potential risks on specific IS projects |
Displays exceptional understanding of concepts and their practical application of controlling potential risks on specific IS projects |
Page | 7
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Assessment 3: Applied Project
| Due date: | Week 10 |
| Group/individual: | Individual |
| Word count / Time provided: | 2500 words |
| Weighting: | 30% |
| Unit Learning Outcomes: | ULO-2, ULO-3, ULO-4, ULO-5, ULO-6, ULO-7 |
| Course Learning Outcomes: | CLO-1, CLO-7, CLO-8 |
| Graduate Attributes: | GA2, GA3, GA4, GA5, GA6 |
In this assignment you will continue working the CardioHealth project. You will need to produce
documents and diagrams related to a few Project Management Knowledge areas.
In this assignment you need to produce the following documents:
• Identify project risks breaking them into categories:
o Market risk: If the IT project will create a new product or service, will it be useful to
the organization or marketable to others? Will users accept and use the product or
service? Will someone else create a better product or service faster, making the
project a waste of time and money?
o Financial risk: Can the organization afford to undertake the project? How confident
are stakeholders in the financial projections? Will the project meet NPV, ROI, and
payback estimates? If not, can the organization afford to continue the project? Is
this project the best way to use the organization’s financial resources?
o Technology risk: Is the project technically feasible? Will it use mature, leading-edge,
or bleeding-edge technologies? When will decisions be made on which technology
to use? Will hardware, software, and networks function properly? Will the
technology be available in time to meet project objectives? Could the technology be
obsolete before a useful product can be created? You can also break down the
technology risk category into hardware, software, and network technology, if
desired.
o People risk: Does the organization have people with appropriate skills to complete
the project successfully? If not, can the organization find such people? Do people
have the proper managerial and technical skills? Do they have enough experience?
Does senior management support the project? Is there a project champion? Is the
organization familiar with the sponsor or customer for the project? How good is the
relationship with the sponsor or customer?
o Structure/process risk: What degree of change will the new project introduce into
user areas and business procedures? How many distinct user groups does the
project need to satisfy? With how many other systems does the new project or
system need to interact? Does the organization have processes in place to complete
the project successfully?
• Stakeholder communication analysis
Sample
Page | 8
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
| Stakeholders | Document Name | Document Format |
Contact Person | Due Date |
| Customer management |
Monthly status report |
Hard copy and meeting |
John, Kate | First of Month |
| Software subcontractor |
Software implementation plan |
Sandeep | June 1 | |
| Comments: |
• Create a project Gantt chart using MS Word or MS Excel
You can watch the following videos for your reference:
https://www.youtube.com/watch?v=un8j6QqpYa0
https://www.youtube.com/watch?v=QZd3iXcueaI
https://www.youtube.com/watch?v=bMxkdiEwWXI
• Create a detailed cost analysis using Excel spreadsheet
• Create a sample Monthly Progress Report
• Create a Project Quality Management Plan
Please remember that this is a practical assessment and you are NOT required to insert any
general information, definitions and references to books and articles. These items will not be
marked.
Page | 9
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Marking Criteria and Rubric: The assessment will be marked out of 100 and will be weighted 30%
of the total unit mark
| Marking Criteria | Not satisfactory (0-49%) of the criterion mark) |
Satisfactory (50-64%) of the criterion mark |
Good (65-74%) of the criterion mark |
Very Good (75-84%) of the criterion mark |
Excellent (85-100%) of the criterion mark |
| Demonstrate an understanding of project risks (20%) |
Inadequate understanding of the project risks; cannot discuss concepts in own words |
Basic knowledge only of the understanding of project risks; limited depth of basic concepts |
Exhibits breadth and depth of understanding of the project risks |
Exhibits accurate and detailed breadth and depth of understanding of project risks |
Displays exceptional understanding of project risks and their practical application in PM |
| Produce a Cost analysis document using Excel spreadsheet (20%) |
Inadequate understanding of NPV; cannot use Excel for producing NPV |
Basic understanding of NPV and Excel features |
Exhibits breadth and depth of understanding of NPV and Excel features |
Exhibits accurate and detailed breadth and depth of understanding of NPV and Excel features |
Displays exceptional understanding of NPV and its practical application. Produces exceptional knowledge of Excel features to calculate NPV. |
| Demonstrate understanding of communication management and ability to create the project Stakeholder Communication Analysis (SCA) and Monthly Progress Report (MPR) documents (40%) |
Inadequate understanding of appropriate techniques and tools for creating SCA and MPR; cannot discuss concepts in own words |
Basic knowledge only of appropriate techniques and tools for creating SCA and MPR; limited depth of basic concepts |
Exhibits breadth and depth of understanding of appropriate techniques and tools for creating SCA and MPR |
Exhibits accurate and detailed breadth and depth of understanding of appropriate techniques and tools for creating SCA and MPR |
Displays exceptional understanding of concepts and their practical application of appropriate techniques and tools for creating SCA and MPR |
| Demonstrate understanding of Project Management tools, techniques and ability to create appropriate Gantt Chart diagrams that will help to visualise information necessary for the project (20%) |
Inadequate understanding of PM diagrams; cannot discuss concepts in own words |
Basic knowledge only of PM diagrams; limited depth of basic concepts |
Exhibits breadth and depth of understanding of MP diagrams |
Exhibits accurate and detailed breadth and depth of MP diagrams |
Displays exceptional understanding of concepts and their practical application of PM diagrams |
Page | 10
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
Assessment 4: Tutorial Participation and Submission
| Due date: | Week 1, 2, 3, 5, 6, 7, 8, 9, 10 |
| Group/individual: | Individual |
| Word count / Time provided: | N/A |
| Weighting: | 10% |
| Unit Learning Outcomes: | ULO-1, ULO-2, ULO-3, ULO-4, ULO-5, ULO-6, ULO-7 |
| Course Learning Outcomes: | CLO-1, CLO-2, CLO-3, CLO-4, CLO-5, CLO-7 |
| Graduate Attributes: | GA1, GA3, GA5 |
Assessment Details:
Different exercises assess students’ ability to understand theoretical materials on a weekly basis.
Students will be given simple activities each week and will be required to provide answers and
achieve identified outcomes.
Students will not be assessed on work that the tutor has not seen them produce in class so that
attendance is required as part of this assessment. Students are required to submit the work that
they have completed during the tutorial session. The details of the tutorial work and requirements
are provided on the online learning system.
Marking Criteria and Rubric: The assessment will be marked out of 100 and will be weighted 10%
of the total unit mark.
| Marking Criteria | Not satisfactory (0-4) mark |
Satisfactory (5-8) mark |
Excellent (9-10) mark |
| Week-1 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-2 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-3 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-4 (marked 0 – 10) (10%) |
submission | satisfactory submission |
excellent submission |
| Week-5 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-6 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-7 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
Page | 11
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
| Week-8 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-9 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
| Week-10 (marked 0 – 10) (10%) |
Attendance and no submission |
Attendance and satisfactory submission |
Attendance and excellent submission |
Assessment 5: Case Study
| Due date: | Week 12 |
| Group/individual: | Individual |
| Word count / Time provided: | 2000 words |
| Weighting: | 30% |
| Unit Learning Outcomes: | ULO1, ULO2, ULO3, ULO4, ULO5, ULO6, ULO7 |
Assessment Details:
In this Case Study students are required to read and discuss an article describing an Information
System development project.
Reference
Lucky, EO, Adegoke, O & Nordin, N 2014, ‘Project management challenges and difficulties: A Case
Study of Information System development’, IPBJ, vol 6, no 1, pp. 99-113, viewed 24 October 2020,
<https://www.researchgate.net/publication/266150891>
This article can also be downloaded from the Canvas SBM4305 Home page.
Your Case Study document should contain the following information and answers to questions:
• Brief description of problem and the aim of the IT project
• The proposed IT infrastructure
• An importance of the Project Manager role in the project success
• The Triple Constraint (scope, time and cost) in the project and how changing the constraints
of one led to suffering of other two.
• Description of the difficulties and issues the Project Manager faced. Identify relations these
problems to the Project Management Knowledge areas:
o Project Integration Management
o Project Scope Management
o Project Time Management
o Project Cost Management
o Project Quality Management
o Project Human Resource Management
Page | 12
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
o Project Communications Management
o Project Risk Management
o Project Stakeholder Management
o Project Procurement Management
• Recommendations, proposed solutions and required potential actions.
Attach a cover sheet to your document that can be downloaded from the Canvas Student Lounge.
Please use Canvas Learning Support materials and Library databases for your document preparation.
You can also look at the materials and watch videos at University of South Australia web page:
https://lo.unisa.edu.au/mod/book/view.php?id=1144638&chapterid=167259
Marking Criteria and Rubric: This assessment will be marked out of 100 and will be weighted 30%
of the total unit mark
| Marking Criteria | Not satisfactory (0-49%) of the criterion mark) |
Satisfactory (50-64%) of the criterion mark |
Good (65-74%) of the criterion mark |
Very Good (75-84%) of the criterion mark |
Excellent (85-100%) of the criterion mark |
| Demonstrate an understanding of project aim and proposed IT infrastructure (10%) |
Inadequate understanding of project aim and proposed IT infrastructure |
Basic knowledge only of the understanding of project aim and proposed IT infrastructure |
Exhibits breadth and depth of understanding of project aim and proposed IT infrastructure |
Exhibits accurate and detailed breadth and depth of understanding of project aim and proposed IT infrastructure |
Displays exceptional understanding of project aim and proposed IT infrastructure |
| Demonstrate understanding of the Triple Constraint (10%) |
Inadequate understanding of the Triple Constraint |
Basic understanding of the Triple Constraint |
Exhibits breadth and depth of understanding of the Triple Constraint |
Exhibits accurate and detailed breadth and depth of understanding of the Triple Constraint |
Displays exceptional understanding of the Triple Constraint |
| Demonstrate understanding of the Project Manager role in IT project (10%) |
Inadequate understanding of the Project Manager role in IT project |
Basic knowledge only of understanding of the Project Manager role in IT project |
Exhibits breadth and depth of understanding of the Project Manager role in IT project |
Exhibits accurate and detailed breadth and depth of understanding of the Project Manager role in IT project |
Displays exceptional understanding of the Project Manager role in IT project |
| Demonstrate understanding of the project difficulties and issues, and their relations to Project Management Knowledge Areas (60%) |
Inadequate understanding of the project difficulties and issues, and their relations to Project Management Knowledge Areas |
Basic knowledge only of understanding of the project difficulties and issues, and their relations to Project Management Knowledge Areas |
Exhibits breadth and depth of understanding of the project difficulties and issues, and their relations to Project Management Knowledge Areas |
Exhibits accurate and detailed breadth and depth of understanding of the project difficulties and issues, and their relations to Project Management Knowledge Areas |
Displays exceptional understanding of the project difficulties and issues, and their relations to Project Management Knowledge Areas |
Page | 13
Asia Pacific International College Pty Ltd. Trading as Asia Pacific International College
55 Regent Street, Chippendale, Sydney 2008: 02-9318 8111
PRV12007; CRICOS 03048D
Approved: 14/02/2019, Version 1
| Document structure and presentation (10 marks) |
Inadequate document structure and presentation |
Basic document structure and presentation |
Good document structure and presentation |
Very good document structure and presentation |
Exceptional document structure and presentation |
The post SBM4305 IS Project Management appeared first on My Assignment Online.