Once primary program activities are identified, costs for each activity should be collected for
the following resource components: (1) noncontract labor, (2) contracted services,
(3) materials and supplies, (4) buildings and facilities, and (5) donated labor and resources
or those not funded by the program. For each component, as the costs are quantified, the
costs for start-up activities and ongoing activities should be separately noted.

  1. Noncontract labor. Noncontract labor costs consist of the total compensation of
    employees for their time spent performing program activities. Total compensation
    includes salaries or wages plus benefits. Noncontract labor costs should be calculated
    (for example, via timesheets) for all individuals whose time spent on the program is
    not captured through another mechanism (i.e., billed directly to the program). If an
    employee works on multiple activities within the program, a timesheet may help
    quantify the amount of time spent on each activity. A sample timesheet and
    accompanying instructions is presented in Table C-1.
  2. Contracted services. Contracted service costs include costs for program activities
    provided by outside entities, such as physician services, consulting, or data
    collection. Documenting contracted service costs is straightforward but requires
    programs to keep track of the bills associated with contracted services and to map
    the bills to the appropriate activity. For example, the cost of physicians who perform
    screenings for the WISEWOMAN program is determined by the bill submitted for
    services rendered. In Canada on the Move, the development and set-up of the Webbased
    interface was provided through a contract with a Web site development firm.
    Table C-2 provides a sample worksheet and accompanying instructions to track these
    costs.
  3. Materials and supplies. The costs of materials and supplies include costs for
    purchases to support program activities (e.g., cookbooks and pedometers for
    WISEWOMAN). Tracking and recording bills for materials and supplies throughout the
    duration of the program facilitates the cost estimation approach. Table C-2 provides
    a sample worksheet and accompanying instructions to track these costs.
  4. Buildings and facilities. The costs of buildings and facilities include rent and/or
    mortgage payments, as well as their physical maintenance and operating costs
    (including utilities, taxes, and insurance). Table C-3 provides a sample worksheet
    and accompanying instructions to track these costs.
  5. Labor and resources donated or not funded by the program. The value of donated
    labor and resources or resources not funded by the program (including contracted
    services, materials and supplies, and buildings and facilities) can be estimated as the
    costs that would have been incurred had these resources not been available for free
    use. For example, if a program is using a building free-of-charge, the value of this
    building could be estimated from current real estate values of monthly rents in the
    surrounding area. The value of the volunteer nutritionist from the WISEWOMAN
    program could be estimated by determining the market salary, or average wage, of a
    similarly qualified nutritionist. In Canada on the Move, the value of the donated
    pedometers should be estimated using the market price of pedometers bought in
    bulk, since the program required a large volume of pedometers. The costs of
    donated labor should be recorded in Table C-1, and the costs of donated materials
    and supplies or buildings and facilities should be appropriately recorded in Tables A-2
    or A-3.
    Chapter 4 — Identifying and Quantifying Program Costs
    4-7
    4.3 Conclusion
    By classifying start-up and ongoing costs by activity and by resource component, two cost
    reports such as those in Table C-4 can easily be generated: one quantifying total program
    costs and another quantifying program costs per participant. This approach will demonstrate
    how costs vary across and within activities. Knowing the cost of each program activity will
    contribute to the economic evaluation of a program and help answer questions about how
    much the program costs, how much specific program activities cost, and how much it would
    cost to expand the program or implement a similar program in another location.
    The checklist in Table 4-1 summarizes several issues discussed in this chapter that should
    be addressed when collecting and analyzing data on program costs. This checklist may help
    you organize and prioritize data needs for program cost analysis.
    Table 4-1. Checklist for Program Cost Analysis
    Decision
    Check When
    Complete
  6. List key program activities.
  7. Determine perspective of the analysis and time frame for cost data
    collection.
  8. List all resources used to support each program activity (e.g., labor,
    donated resources).
  9. Create system and forms for collecting and analyzing cost data (see
    Appendix C for sample forms).

The post Subdividing Activity Costs by Resource Component appeared first on My Assignment Online.

Plagiarism Free Assignment Help

Expert Help With This Assignment — On Your Terms

✓ Native UK, USA & Australia writers ✓ Deadline from 3 hours ✓ 100% Plagiarism-Free — Turnitin included ✓ Unlimited free revisions ✓ Free to submit — compare quotes

admin

Academic writer and editor at BestWriters.

Get your paper off your plate tonight

Post your instructions for free. Prices start at $5 per page.

Place an order