Assignment Final – Instructions
WUFI PLUS simulation
Note: Everywhere I have “Surname, First Name” put your own name.
1. Open a new project and save under: Assignment_final_2020_1_Surname_Name
2. Name the project as shown on the following screen shot:
3. Click on “Cases“
4. Describe Case 1 as: Surname First name 1. As shown on the following screen shot:
5. Click on “Case 1” and check if you have following general information for your project as
shown on the following screen shot:
• Calculation mode: Hygrothermal
• Start: 1 January 2020
• End: 1 January 2021
• Maximal time step results 1 hour
6. Specify the location/climate for Auckland by clicking on “Brows”, selecting “Oceania” and
double click on Auckland.
7. Set an Optional Climate for the Ground under the slab as File based with following details:
8. In the Building Wizard create the building with the following dimensions:
• Main facade d1 9 m
• d2 6 m
• Story height 2.4 m
• First floor height 2.4 m
• Number of stories 1
• Roof geometry choose the second option without the habitable attic
• h1 0.5 m
• Roof inclination 42 degree
• Tick the gable ends
• Roof overhang 0.6 m
• Bottom section – choose the third option without any cellar
• Change the main orientation to North
9. Now you are going to specify assembly of your visualized elements.
10. For the Component 1 – basement choose “Basement_ceiling_till1983_reinforced concrete
with 4cm insulation” from the database and assign. Then click on “Edit”, rename to
“Basement_NZ” and provide changes to the assembly to achieve following set-up:
• Vapour retarder 0.001 m
• EPS 0.04 m
• Concrete 0.10 m
• Concrete screed 0.02 m
• Click on “Surface” and specify the climate on the external surface by assigning the
optional climate
11. Component 2 – ceiling – choose “Ceiling_till1994_joist ceiling with 12cm insulation” from the
material database. Edit this assembly by clicking on “Edit” and rename to “Ceiling_NZ”.
Delete the layer 1 Oak, radial and the layer 4. Softwood. Change the thickness of the air layer
to 0.5 m. Click on the number 2 Mineral Wool, then click on “Material database” and search
under North America Database for Insulation Materials – “Low density glass fibre batt
insulation” and click on “Apply” to assign this material to the layer 2. You should have
following configuration:
12. Component 3 – exterior wall – select “Lightweight timber framed wall” from the database,
click “Edit”. Rename to “Lightweight timber framed wall NZ” and edit to match a typical NZ
construction.
• Delete the layer 5. PE membrane
• Change the thickness of the layer 4. Mineral wool to 0.09 m. Click on this layer, then click
on “Material database” and search under North America Database for Insulation
Materials – “Low density glass fibre batt insulation” and click on “Apply” to assign this
material to the layer 4. You should have following configuration:
13. Create following windows/openings:
North wall:
East wall:
South wall:
Note: You click on “Building” and “3D Editor”, double click on the wall where you want to create an
opening, the wall is red highlighted. Then right click, selecting “windows/openings” and creating new
openings as specified in the screen shots above.
14. Window parameters assignment
To each opening element you need to assign following window from the data base:
15. Specify Internal Loads/Occupancy – Select from data base “Single household”
16. Design conditions are automatically set by the periodic day profiles set in the previous step.
17. Ventilation
• Leave for the first case calculation the preset natural ventilation.
• Change the infiltration ACH to 0.4 because this house is not air tight.
18. Under Simulated zones, Zone 1 specify the volumes and areas as follows:
19. Specify the attached zone 1 – Unheated Attic inner climate as the outer climate and the
volumes and area similarly as by the zone 1 “From visualized volume and components”.
20. Click on “Case 1.” In the project tree
• Control if the button by “Data state/results” is green and if so, click on the “Start” to
start the calculation.
• If the button is red than follow the description of missing/insufficient/wrong input
data and correct them.
• When the button is green start the calculation.
21. When the calculation is finished
• click on “Report: data & results”
• click on “Output selection”
• highlight the following parts as shown on the screen shot:
• click on “Report data & results” and select “Results” under Scope and “Print/Export
layout” under View as shown on the screen shot:
• click the last symbol to print your results
• Save the results as “Case 1_your name”
22. Right click on Case 1: Copy current case
23. Click on Case 2 and rename it in General to “Surname First name 2.”
24. Change the infiltration rate in “Natural ventilation” to 0.1 because the house has an
airtightness layer.
25. Click on Component 2
• Click on Edit
• Click on Make new copy
• Rename to “Ceiling_NZ_airtight”
• Click on 2 Low density glass fibre insulation
• Click on “Insert” – new layer will open
• Click on “Material database” and search for “Intello”
• Apply the Intello (according to German approval 2015)
• Thickness is 0.001 (in WUFI all membranes have a thickness of 1 mm)
• Click on “Insert” to create another layer
• In the Material database search for air layers and apply a 40mm thick air layer
You should have following assembly:
26. Provide the same changes to the Component 3 as in the previous step 25. Do not forget to
rename the assembly! You should have the following assembly for the exterior walls:
27. Start the calculation for the Case 2 (the button must be green before you run the simulation).
After the calculation is finished print the results similarly to the Case 1 (step 21.).
28. Create one more copy of the Case 1 and rename it to “Surname First name 3.”
29. In the Case 3 under HVAC – “System type” choose “User defined”
• Under System 1 (user defined) by the Solar collector remove the space heating
• Add a new system “Mechanical ventilation”
The HVAC System 1 specification should look as follows:
30. Click on Ventilation in the Case 3
• Put 4 [l/h] into the Day-profile of the “Mechanical ventilation” as shown below:
31. Run the calculation for Case 3. After the calculation is finished print the results similarly to
the Case 1 (step 21.).
32. Create a copy of the Case 2 and rename it to “Surname First name 4.”
33. In the newly created Case 4 provide exactly the same changes to HVAC and Ventilation as in
the Case 3 which are described in the steps 29. and 30. (above).
34. Run the calculation for Case 4. After the calculation is finished print the results similarly to
the Case 1 (step 21.).