ELE3803 Electrical Plant
Week 7
Energy Audit
1
Assignment 2
Energy Audit
Due 19th May
Weighting: 15%
Submission by EASE
2
Energy Audit
Level 2 Audit as Per AS/NZS 3598:2000
Individual Audit data provided
3
Air Compressors
3%
Cooking
1%
Cooling
40%
Lighting (Exterior)
0%
Lighting (Interior)
19%
Office Equipment
5%
Other Plug Loads
1%
Pumps
6%
Refrigeration
3%
Ventilation
22%
Peak Demand (kW) Breakdown
Assignment 2
What is going to be supplied?
– Plant Geographic location
– Nameplate Data
– Load Survey and Billing Data
– Usage information
4
Assignment 2
What Do We have to Do?
– Choose a Plant type
– Look up AS3598
– Read Resource material on study desk
– Compile a report in format supplied
5
The post ELE3803 Electrical Plant appeared first on My Assignment Online.
Plagiarism Free Assignment Help
Expert Help With This Assignment — On Your Terms
✓ Native UK, USA & Australia writers
✓ Deadline from 3 hours
✓ 100% Plagiarism-Free — Turnitin included
✓ Unlimited free revisions
✓ Free to submit — compare quotes