PROJ6002- Case Study for Supplementary Assignment

PROJ6002- Case Study for Supplementary Assignment
Trimester 1-2020
1
Project Description
As a project manager, you are to construct a Gantt chart and complete project scheduling
as well as to develop the cost management planning components of your Cost Management
Plan. Table 1 identifies the activities within a small project where all dependencies are
presented.
Project Document
Your project document should involve the following aspects:
Create a WBS and a complete project schedule using a manual or software method of your
choice and critically analyse the developed schedule.
Table 1- The dependency table and the estimated cost of activities

Activity Activity Predecessor Expected
Duration
(weeks)
Estimated
Cost
($)
A Excavate the Site 1 2800
B Lay the Foundation A (FS) 2 4200
C Put up the Rough Wall B (FS+1) 7 8600
D Put up the Roof C (FS) 4 3400
E Install the Exterior Plumbing C (FF-1) 3 5700
F Install the Interior Plumbing E (FS) 3 2600
G Put up the Exterior Siding D (FS) 4 10200
H Do the Exterior Painting E(FS),G(SS+3) 6 3800
I Do the Electrical Work C (FS) 5 2700
J Put up the Wallboard F(FS),I(FS) 6 4900
K Install the Flooring J (FS) 3 2000
L Do the Interior Painting J (FS) 3 3500
M Install the Exterior Fixtures H (FF+1) 1 2000
N Install the Interior Fixtures K(FS),L(FS) 3 5100
O Project Closure M(FS),N(FS) 1 1700

PROJ6002- Case Study for Supplementary Assignment
Trimester 1-2020
2
Estimate the cost of each activity using various tools and techniques. Critically discuss the
appropriateness of tools and techniques used for your cost estimation and their applications.
Your cost estimate must incorporate at least one resource given in Table 2 for each given
activity. You also need to demonstrate different elements of cost within your cost
estimation and the detailed budget.
Table 2- The available resources for the project
Develop and aggregate the cost of resources needed to complete each activity and
determine the detailed budget of the project.
In addition to your cost estimates and budget, include a 750-word writing to describe the
processes, and tools and techniques you are using in your cost control. Further, clearly
explain how your budgetary plan will be managed . You can use the templates found in this
module’s Learning Resources or a format of your own.

Name Resource Type Title Hours
Rate ($)
Carol Johnson Safety Safety Engineer 50
Bob Hoskins Engineering Industrial Engineer 45
Sheila Thomas Management Project Manager 70
Randy Egan Management Site Manager 55
Stu Hall Industrial Foreman 40
Susan Berg Accounting Cost Accountant 50
Marty Green Industrial Shop Supervisor 53
John Pittman Quality Quality Engineer 55
Sally Reid Quality Jr. Quality Engineer 38
Lanny Adams Sales Marketing Manager 52
Kristin Abele Purchasing Purchasing Agent 42

The post PROJ6002- Case Study for Supplementary Assignment appeared first on My Assignment Online.

Plagiarism Free Assignment Help

Expert Help With This Assignment — On Your Terms

Native UK, USA & Australia writers Deadline from 3 hours 100% Plagiarism-Free — Turnitin included Unlimited free revisions Free to submit — compare quotes
Scroll to Top