Critical
review and evaluation of a selected topic
Assessment Details:
Design of Project Delivery System
influences the success or failure of the implementation phase of
projects and programs. It is not
just about selecting a contact model; it provides a framework for
procurement of goods and services
needed to implement the project.
This assessment task is based on the
review and evaluation of selected project delivery (contract)
method. Students will be required to
select one of the following five main contract types identified
by Kerzner and complete a critical
review and evaluation of that contract type in an industry of their
choice.
The five main types listed on pg
975-1014 of the textbook1 are:
1. Fixed-price
2. Cost-plus-fixed fee or
Cost-plus-percentage fee
3. Guaranteed-Maximum-shared-savings
4. Fixed-price-incentive-fee
5. Cost-plus-incentive-fee
This assessment task includes three
components:
1. A detailed literature review on
the selected contract type, including the typical delivery
models and contexts in the field or
industry of interest.
2. A detailed evaluation of the
suitability of the methodology for successful project delivery
in the chosen field or industry of
interest.
3. A consideration of the relevance
of the contract type together with conclusions and
recommendations for future use of
the method.
Harvard referencing style